Launching Soon
Pacific Climate Group
Pacific Climate Group
Mechanical · Earthwork · General Building

One contractor from the first cut to commissioning.

Most projects hand the dirt to one subcontractor and the mechanical system to another, six weeks apart, and pay to mobilize twice. Pacific Climate Group is being built to carry both under one subcontract and self-perform both.

Expertise
Mechanical · Earthwork · General Building
Service Area
Los Angeles & Southern California
Status
Launching soon
Scope

Where our expertise sits.

Three areas, built around trades we intend to self-perform rather than broker. Work outside them is performed by licensed trade partners under a contract we carry and coordinate.

Mechanical
Heating, ventilation & air conditioning
  • Heat pump and split systems
  • Ductwork, distribution, ventilation
  • Refrigerant piping, including A2L (R-32 / R-454B)
  • Controls and zoning
  • Startup, commissioning, test and balance
Earthwork
Site, underground & paving
  • Mass and structural excavation
  • Export, import, shoring coordination
  • Trenching for utilities and site drainage
  • Backfill and compaction to spec
  • Finish grading, aggregate base, paving
General Building
Multi-trade packages
  • Multi-trade packages as a single subcontract
  • One schedule across the trade interfaces
  • Coordination of licensed trade partners
  • Single point of accountability to the GC
How we work

The interfaces are where projects lose money.

Condensate to the drain. Disconnects to the equipment. Trenching to the underground utility. These sit between scopes on most jobs, and that is where the schedule slips.

Verified quantities

Outdoor unit counts taken from the roof plan and cross-checked against indoor units, not tag-counted per floor. Cut and fill balance stated and sourced before the bid, so export is a known number instead of a change order.

Current on code

Title 24 compliance, and the A2L refrigerant requirements now governing residential and light commercial heat pump work.

Costed by phase

Budget against actual tracked by phase and cost code, so a variance surfaces while the job is running rather than at closeout.

Documented before cover

Daily logs, compaction testing coordinated, and a photo record of subgrade and backfill before anything is buried.

Built to prequalify

Bonding, insurance and safety documentation are being assembled as one package, so prequalification is a single hand-off rather than a scavenger hunt.

Contact

Get in touch ahead of launch.

info@pacificclimategroup.com

We are not yet open for bid. Introductions from general contractors, developers and design teams are welcome now, and we will follow up as soon as we launch.